Wind · BayWa r.e. Australia Offshore Wind Projects 2 Pty Ltd · Wind Turbine - Offshore
15 Jun 2026 01:25 → 16 Jun 2026 01:25 AEST
| Capex total (greenfield) |
$5,451.14M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
—
|
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$184,149
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 06 Jun 2026
Notes
No plant-specific greenfield investment announcement was found for Deal 2 (East) Off Shore Wind Farm or BayWa r.e. Australia Offshore Wind Projects 2 Pty Ltd. CAPEX therefore uses the AEMO/Aurecon 2024 hypothetical floating offshore wind benchmark as an estimated fallback, not a reported project cost. Offshore wind O&M benchmark from the same source was used; variable O&M was treated as nil because it is included in fixed O&M in the benchmark.