Dawson Wind Farm

Wind · Highland Energy Australia Pty Ltd · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 7 days
560 MW
Researched capacity
Est. SRMC
$0.50/MWh
Key information
Capacity (AI)
560 MW

AEMO spreadsheet entry for Dawson Wind Farm lists 560.00 MW, but no independent public announcement located in the provided results.

AEMO status Publicly Announced
Project status Development (AI)

AEMO spreadsheet label is "Publicly Announced"; treated as pre-construction/development rather than operational.

Coordinates

DUID
Owner Highland Energy Australia Pty Ltd
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
08 Jun 2026 04:00 → 15 Jun 2026 04:00 AEST

Dispatch & revenue

08 Jun 2026 04:00 → 15 Jun 2026 04:00 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
560 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.50/MWh
Capex total (greenfield)
$1,299.58M

Shown in table
$1,299.58M (2026 real AUD)

Reported / source value
$1,232.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$0.50

Shown in table
$0.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
No plant-specific greenfield capex announcement for Dawson Wind Farm was found in the searched official owner/developer or government sources. The project is currently described in EPBC materials as a proposed up to 600 MW wind farm with 500 MW / 1000 MWh BESS, developed by Highland Energy Australia Pty Ltd (an EDF-related SPV). Because no reported project investment figure was located, capex and O&M are left unfilled rather than inferred from benchmarks. Onshore wind benchmark values from AEMO/CSIRO 2024 are available if a fallback estimate is later required.

Sources