| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh default |
$0.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
Project is a proposed 325 MW onshore wind farm in Moyne Shire, Victoria, with an expected operational life of 30 years and approximately 22 month construction period. No project-specific greenfield capex figure was found in official owner/government sources in the searched results, so capex and O&M remain unfilled pending further source-backed research.