13 Jun 2026 19:20 → 14 Jun 2026 19:20 AEST
| Capex total (greenfield) |
$5.76M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,371,308
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$88.6k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$21,097
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.26
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No plant-specific greenfield capex figure was found in the searched official/project sources. The project is currently listed by NSW Planning as withdrawn; planning documents describe an estimated 300 MW solar photovoltaic facility, while NEMStats lists a 4 MW capacity for this generator entry. O&M values use AEMO/GHD utility-scale solar PV assumptions as a fallback proxy. Capacity-linked OPEX shown for 4.2 MW uses the server-side capacity provided by the user.