07 Jun 2026 21:10 → 14 Jun 2026 21:10 AEST
| Capex total (greenfield) |
$74.63M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$15,106,653
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$82.8k
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$16,766
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$0.00
Shown in table Reported / source value |
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Plant-specific capex evidence was not found for this exact 4.94 MW site and owner. The closest project-specific source found was FRV's Dalby Hybrid Power Plant announcement stating work had begun on a $60 million project comprising 2.4 MW solar PV and a 2.5 MW/5 MWh battery near Dalby; this appears to be a different, smaller hybrid asset, so capex_total_aud is likely an over-matched proxy and should be reviewed. O&M defaults were taken from AEMO/Aurecon's 2024 solar PV review for a 4.99 MW ground-mount system, using fixed O&M of $13,360/MWp-year and annualised to site capacity. Variable O&M, fuel cost, heat rate and emissions are set to solar defaults.