Cultana Solar Farm

Solar · Cultana Solar Project Company Pty Ltd as trustee for the Cultana Solar Farm Trust · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
357 MW
Researched capacity
Est. SRMC
$0.25/MWh
Key information
Capacity (AI)
357 MW

Provided AEMO spreadsheet context in prompt (357.45 MW); no separate owner/planning-source capacity found.

AEMO status Publicly Announced
Project status Development (AI)

No primary-source evidence of construction or operation was found; project remains in announced/planning phase based on the provided AEMO status context.

Coordinates —

DUID —
Owner Cultana Solar Project Company Pty Ltd as trustee for the Cultana Solar Farm Trust
Commissioned Dec 2029
Expected closure 2055
Closure date —
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM —
Module / inverter supplier —
Inverter OEM —
Inverter model —
Stats window
25 Sep 2026 07:00 → 26 Sep 2026 07:00 AEST

Dispatch & revenue

25 Sep 2026 07:00 → 26 Sep 2026 07:00 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
357 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield)
$455.73M

Shown in table
$455.73M (2026 real AUD)

Reported / source value
$350.00M (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
This is a broader program figure, not the plant-specific construction cost, so it was not used as capex_total_aud.

Reference
Cultana Solar Farm Factsheet (low confidence)
Source recorded 07 Jun 2026

Capex refurbishment
—
Capex / MW derived
$1,274,945

Shown in table
$1.27M (2026 real AUD)

Reported / source value
$979.2k (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated from the reported capex and the user-provided capacity.

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Plant-specific reported greenfield capex found in public sources as $350 million for the 280 MW Cultana Solar Farm project announced/preparing for construction in 2019-2022 materials. Capacity used for per-MW calculation is the registered/project capacity provided (357.45 MW), so per-MW is an implied figure rather than the source's original capacity basis. No verified plant-specific fixed/variable O&M or fuel assumptions were found; solar PV has no fuel cost or heat rate, and emissions intensity is zero.

Sources