13 Jun 2026 20:55 → 14 Jun 2026 20:55 AEST
| Capex total (greenfield) |
$1,160.34M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,637,131
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$9.85M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$22,388
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.25
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Corop Solar Farm is reported by Leeson Group as valued at over $1 billion and comprises a 440 MW DC solar farm with up to 800 MWh BESS. Capex_total_aud is taken from the project value statement; capex_per_mw_aud is calculated using the registered 440 MW site capacity, so the figure is indicative and may include the battery/precinct scope rather than solar-only works. Fixed OPEX is based on internal defaults because no plant-specific O&M source was found in the search. Asset life assumed at 30 years from AEMO solar PV technical assumptions.