Solar · Lightsource Development Services Australia Pty Ltd · Solar PV - Fixed
14 Jun 2026 08:45 → 15 Jun 2026 08:45 AEST
| Capex total (greenfield) |
$116.03M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,160,338
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.90M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$18,987
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.21
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
No plant-specific greenfield capex figure was found in owner, government, or project-finance sources for the 100 MW Cooma Solar Farm. The available ACEN project pages and EPBC referral confirm the project is a proposed 100 MW AC solar project with a 180 MW / 2-hour BESS, but do not disclose total construction cost. O&M and life assumptions therefore use AEMO/Aurecon benchmark-style technology defaults for utility-scale fixed-tilt solar PV, with fixed O&M annualised to the 100 MW capacity. The project description shows the current proponent branding is ACEN Australia, while the user-supplied owner name is Lightsource Development Services Australia Pty Ltd; the search results did not provide a definitive plant-specific cost attributable to the site.