Cooma Solar And BESS (ACEN)

Solar · ACEN RENEWABLES · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 7 days
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.25/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner ACEN RENEWABLES
Commissioned
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
07 Jun 2026 19:05 → 14 Jun 2026 19:05 AEST

Dispatch & revenue

07 Jun 2026 19:05 → 14 Jun 2026 19:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield)

How this was derived
The owner page mentions significant construction investment but does not disclose a dollar amount.

Reference
Cooma Solar - ACEN Australia (high confidence)
Source recorded 05 Jun 2026

Capex refurbishment
Capex / MW
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)

How this was derived
The source describes the project but does not disclose O&M costs.

Reference
Cooma Solar - ACEN Australia (low confidence)
Source recorded 05 Jun 2026

Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

How this was derived
No variable O&M figure was disclosed.

Reference
Cooma Solar - ACEN Australia (low confidence)
Source recorded 05 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
ACEN’s project pages and public approvals documents confirm the Cooma Solar and battery project is proposed as a 100 MW solar farm with 180 MW of battery storage, using single-axis trackers, with construction expected in 2027 and operation expected by late 2028. No plant-specific greenfield capex figure was located in the searched owner/developer, government, or news sources, so capex remains unfilled rather than substituted with a benchmark. Because the project is not yet operating, O&M and performance assumptions are left blank pending a more specific source or benchmark review.

Sources