Solar · ACEN RENEWABLES · Solar PV - Single axis tracking
15 May 2026 18:45 → 14 Jun 2026 18:45 AEST
| Capex total (greenfield) |
—
How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,371,308
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
How this was derived Reference |
| Fixed OPEX / MW-yr default |
$20,000
Shown in table |
| Variable OPEX / MWh default |
$0.25
Shown in table How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
ACEN’s project pages and public approvals documents confirm the Cooma Solar and battery project is proposed as a 100 MW solar farm with 180 MW of battery storage, using single-axis trackers, with construction expected in 2027 and operation expected by late 2028. No plant-specific greenfield capex figure was located in the searched owner/developer, government, or news sources, so capex remains unfilled rather than substituted with a benchmark. Because the project is not yet operating, O&M and performance assumptions are left blank pending a more specific source or benchmark review.