Collinsville Green Energy Hub

Wind · COLLINSVILLE GREEN ENERGY HUB PTY LTD · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 480h
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.58/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner COLLINSVILLE GREEN ENERGY HUB PTY LTD
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
01 Jun 2026 00:00 → 21 Jun 2026 00:10 AEST

Dispatch & revenue

01 Jun 2026 00:00 → 21 Jun 2026 00:10 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.58/MWh
Capex total (greenfield)
$8,761.68M

Shown in table
$8,761.68M (2026 real AUD)

Reported / source value
$7,500.00M (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Ark Energy states the project has capital investment of about A$7.5 billion.

Reference
Collinsville Green Energy Hub | Ark Energy (high confidence)
Source recorded 06 Jun 2026

Capex refurbishment
Capex / MW
$2,920,561

Shown in table
$2.92M (2026 real AUD)

Reported / source value
$2.50M (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Ark Energy describes Collinsville Green Energy Hub as 3,000 MW in development, enabling a derived capex per MW from the reported total investment.

Reference
Ark Energy appoints new CEO (high confidence)
Source recorded 06 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$64,252

Shown in table
$64.3k (2026 real AUD)

Reported / source value
$55.0k (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific fixed O&M figure was found; default provided by user was retained.

Variable OPEX / MWh
$0.58

Shown in table
$0.58 (2026 real AUD)

Reported / source value
$0.50 (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific variable O&M figure was found; default provided by user was retained.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026

Notes
Project-wide capital investment of about A$7.5 billion reported by Ark Energy for the Collinsville Green Energy Hub. The project is described as up to 3,000 MW, so capex_per_mw_aud is derived from the reported total divided by that headline capacity; this is a precinct-level figure, not a DUID-specific unit cost. No separate plant-specific operating-cost or refurbishment figures were found in the searched sources.

Sources