Wind · COLLINSVILLE GREEN ENERGY HUB PTY LTD · Wind Turbine - Onshore
19 Jun 2026 21:35 → 20 Jun 2026 21:35 AEST
| Capex total (greenfield) |
$8,761.68M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,920,561
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$64,252
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Project-wide capital investment of about A$7.5 billion reported by Ark Energy for the Collinsville Green Energy Hub. The project is described as up to 3,000 MW, so capex_per_mw_aud is derived from the reported total divided by that headline capacity; this is a precinct-level figure, not a DUID-specific unit cost. No separate plant-specific operating-cost or refurbishment figures were found in the searched sources.