22 Jun 2026 00:00 → 22 Jun 2026 17:30 AEST
| Capex total (greenfield) |
$1,413.93M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,413,934
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$18.44M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$18,443
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.20
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Publicly available sources describe Cobbora as a 700 MWac solar facility plus a 400 MW / 1600 MWh BESS, developed by Pacific Partnerships/CIMIC. A reported total project cost of AUD 1.38 billion was found in project reporting/news coverage and attributed to the full solar-plus-storage project. Because the user-provided capacity is 1000 MW and the source cost appears to cover a different capacity/configuration, the capex_per_mw_aud is a mechanical division of the reported total by 1000 MW and should be treated cautiously.