Other Generators · Benedict Indistries P/L · Turbine - Steam Sub Critical
14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST
| Capex total (greenfield) |
$16.88M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,109,705
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table |
| Variable OPEX / MWh default |
$2.00
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
I could not verify that an operating 8 MW waste-to-energy steam turbine generator at Chipping Norton exists from the sources searched; available official sources point to Benedict Recycling resource-recovery and biofuel-related activities at Chipping Norton rather than a clearly documented grid generator. Because no project-specific capex was found, financial and operating defaults were not substituted in order to avoid misclassifying benchmark values as reported project costs.