Chipping Norton Waste to Energy

Other Generators · Benedict Indistries P/L · Turbine - Steam Sub Critical

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
8 MW
Researched capacity
Est. SRMC
$2.00/MWh
Key information
Capacity (AI)
8 MW

AEMO spreadsheet entry for Chipping Norton Waste to Energy lists 8.00 MW nameplate capacity; no separate storage capacity was identified.

AEMO status Publicly Announced
Project status Development (AI)

AEMO registration status is Publicly Announced, which aligns with a pre-construction / development phase for the project rather than operational status.

Coordinates

DUID
Owner Benedict Indistries P/L
Commissioned
Expected closure
Closure date
Technology Turbine - Steam Sub Critical
Fuel Other - Other
Equipment OEM
Equipment type / model Steam turbine generator (subcritical waste-to-energy plant)
Equipment confidence low
Stats window
14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST

Dispatch & revenue

14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Other
Capacity
8 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$2.00/MWh
Capex total (greenfield)
$16.88M

Shown in table
$16.88M (2026 real AUD)

Reported / source value
$16.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$2,109,705

Shown in table
$2.11M (2026 real AUD)

Reported / source value
$2.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh default
$2.00

Shown in table
$2.00 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
I could not verify that an operating 8 MW waste-to-energy steam turbine generator at Chipping Norton exists from the sources searched; available official sources point to Benedict Recycling resource-recovery and biofuel-related activities at Chipping Norton rather than a clearly documented grid generator. Because no project-specific capex was found, financial and operating defaults were not substituted in order to avoid misclassifying benchmark values as reported project costs.

Sources