Solar · First Solar Australia Pty Ltd · Solar PV - Single axis tracking
14 Jun 2026 04:45 → 15 Jun 2026 04:45 AEST
| Capex total (greenfield) |
$527.43M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,660,889
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$2.39M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$21,097
Shown in table Reported / source value |
| Variable OPEX / MWh |
$0.26
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
A Western Downs Development Status Report lists Chinchilla Solar Farm (First Solar) at $500 million in 2024; this is used as the best available plant-specific reported greenfield cost. The site is also described elsewhere as a 100 MW project with First Solar thin-film modules and single-axis tracking, but public sources did not clearly reconcile the reported 2024 cost with the registered 113.16 MW capacity. Fixed O&M and variable O&M use internal defaults because plant-specific O&M data were not found.