Solar · juwi Renewable Energy Pty Ltd · Solar PV - Single axis tracking
03 Jun 2026 18:00 → 04 Jun 2026 18:00 AEST
| Capex total (greenfield) |
$158.19M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,613,976
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$1.24M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$12,658
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$0.00
Shown in table Reported / source value |
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026
Notes
Project-specific construction cost of A$150 million was listed in the Western Downs Development Status Report 2024 for Chances Plain Solar Farm (100 MW) by juwi Renewable Energy Pty Ltd. O&M and life assumptions use AEMO/Aurecon 2024 solar PV benchmark values; single-axis tracking is consistent with the AEMO/Aurecon solar PV report for mid-size utility PV.