Central Para Wind Farm (KCI)

Wind · Macleay Ventures Pty Ltd. · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
399 MW
Researched capacity
Est. SRMC
$0.53/MWh
Key information
Capacity (AI)
399 MW

AEMO spreadsheet entry for Central Para Wind Farm (KCI) shows 399.00 MW (user-provided context); no independent public capacity source was returned in web results.

AEMO status Publicly Announced
Project status Development (AI)

No public project-specific source returned in provided search results; inferred from AEMO registration status 'Publicly Announced' and lack of evidence of construction/commissioning or operation.

Coordinates

DUID
Owner Macleay Ventures Pty Ltd.
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Equipment confidence low
Stats window
14 Jun 2026 02:20 → 15 Jun 2026 02:20 AEST

Dispatch & revenue

14 Jun 2026 02:20 → 15 Jun 2026 02:20 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
399 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)
$925.95M

Shown in table
$925.95M (2026 real AUD)

Reported / source value
$877.80M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated from the provided server-side fallback capex of $2.2 million/MW times 399 MW because no verified project-specific investment announcement was found.

Capex refurbishment
Capex / MW derived
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Provided fallback capex per MW used only after no verified project-specific capex was found.

Fixed OPEX (annual)
$23.15M

Shown in table
$23.15M (2026 real AUD)

Reported / source value
$21.95M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated annual fixed OPEX from the default fallback rate and plant capacity.

Fixed OPEX / MW-yr
$58,017

Shown in table
$58.0k (2026 real AUD)

Reported / source value
$55.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Provided fallback fixed OPEX rate used as the plant-specific value was not verified.

Variable OPEX / MWh
$0.53

Shown in table
$0.53 (2026 real AUD)

Reported / source value
$0.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Provided fallback variable OPEX rate used as the plant-specific value was not verified.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
No plant-specific greenfield capex announcement could be verified in web search results for Central Para Wind Farm (KCI) / Macleay Ventures Pty Ltd.; capex therefore falls back to the provided server-side default. Onshore wind O&M and indicative life assumptions were aligned to AEMO/CSIRO GenCost 2024-style onshore wind assumptions where possible, but the wind-specific capex/opex values for this exact site were not directly verified from an owner/developer source. The project is listed as publicly announced with 399 MW capacity.