Wind · Macleay Ventures Pty Ltd. · Wind Turbine - Onshore
14 Jun 2026 02:20 → 15 Jun 2026 02:20 AEST
| Capex total (greenfield) |
$925.95M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,320,675
Shown in table Reported / source value How this was derived |
| Fixed OPEX (annual) |
$23.15M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No plant-specific greenfield capex announcement could be verified in web search results for Central Para Wind Farm (KCI) / Macleay Ventures Pty Ltd.; capex therefore falls back to the provided server-side default. Onshore wind O&M and indicative life assumptions were aligned to AEMO/CSIRO GenCost 2024-style onshore wind assumptions where possible, but the wind-specific capex/opex values for this exact site were not directly verified from an owner/developer source. The project is listed as publicly announced with 399 MW capacity.