Ceduna Wind Farm

Wind · tetrisenergy_nr · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 30 days
400 MW
Researched capacity
Est. SRMC
$0.53/MWh
Key information
Capacity (AI)
400 MW

AEMO spreadsheet (project entry for Ceduna Wind Farm) lists 400.00 MW; no separate public capacity source was found in the supplied results.

AEMO status Publicly Announced
Project status Development (AI)

AEMO spreadsheet lists Ceduna Wind Farm as "Publicly Announced"; treated as pre-construction/development rather than operating.

Coordinates

DUID
Owner tetrisenergy_nr
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Equipment confidence low
Stats window
16 May 2026 02:20 → 15 Jun 2026 02:20 AEST

Dispatch & revenue

16 May 2026 02:20 → 15 Jun 2026 02:20 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
400 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)
$928.27M

Shown in table
$928.27M (2026 real AUD)

Reported / source value
$880.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated indicative total capex from the fallback unit cost and the stated 400 MW capacity.

Capex refurbishment
Capex / MW derived
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Fallback capex intensity supplied by user prompt; applied only because searches did not surface a project-specific greenfield cost.

Fixed OPEX (annual)
$23.21M

Shown in table
$23.21M (2026 real AUD)

Reported / source value
$22.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated annual fixed O&M from the fallback unit rate and capacity.

Fixed OPEX / MW-yr
$58,017

Shown in table
$58.0k (2026 real AUD)

Reported / source value
$55.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Fallback fixed O&M intensity supplied by user prompt.

Variable OPEX / MWh
$0.53

Shown in table
$0.53 (2026 real AUD)

Reported / source value
$0.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Fallback variable O&M intensity supplied by user prompt.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 06 Jun 2026

Notes
No plant-specific greenfield capex announcement was found in the searched sources, so AEMO/CSIRO-style fallback assumptions were used for capex and O&M. Onshore wind has no fuel cost and zero direct emissions. Owner listed in NEMStats as Tetris Energy; project status publicly announced; capacity 400 MW.

Sources