Ceduna Solar Farm

Solar · tetrisenergy_nr · Solar PV - Fixed

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
200 MW
Researched capacity
Est. SRMC
$0.21/MWh
Key information
Capacity (AI)
200 MW

AEMO spreadsheet entry for Ceduna Solar Farm shows 200.00 MW (project-record figure used because no better public capacity source was returned).

AEMO status Publicly Announced
Project status Development (AI)

AEMO registration status is Publicly Announced, which aligns with a pre-construction / development phase rather than operational status.

Coordinates

DUID
Owner tetrisenergy_nr
Commissioned
Expected closure
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
13 Jun 2026 16:45 → 14 Jun 2026 16:45 AEST

Dispatch & revenue

13 Jun 2026 16:45 → 14 Jun 2026 16:45 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
200 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.21/MWh
Capex total (greenfield)
$232.07M

Shown in table
$232.07M (2026 real AUD)

Reported / source value
$220.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$1,160,338

Shown in table
$1.16M (2026 real AUD)

Reported / source value
$1.10M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$3.80M

Shown in table
$3.80M (2026 real AUD)

Reported / source value
$3.60M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$18,987

Shown in table
$19.0k (2026 real AUD)

Reported / source value
$18.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
User-provided internal default applied because no project-specific O&M source was found.

Variable OPEX / MWh
$0.21

Shown in table
$0.21 (2026 real AUD)

Reported / source value
$0.20 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
User-provided internal default applied because no project-specific variable O&M source was found.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
No plant-specific greenfield capex announcement for Ceduna Solar Farm was found in the searched official/industry sources. AEMO/CSIRO benchmark capex was not applied because the requested project-specific figure could not be verified. Fixed OPEX used server-side fallback; asset life is a typical assumption for utility-scale solar PV.