| Capex total (greenfield) |
$232.07M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,160,338
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$3.80M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$18,987
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.21
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No plant-specific greenfield capex announcement for Ceduna Solar Farm was found in the searched official/industry sources. AEMO/CSIRO benchmark capex was not applied because the requested project-specific figure could not be verified. Fixed OPEX used server-side fallback; asset life is a typical assumption for utility-scale solar PV.