Cattle Creek Wind Farm - KCI

Wind · RWE Renewables Australia Pty Ltd · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.51/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

No web results returned; AEMO registration status is Publicly Announced, which indicates pre-construction/development rather than operational.

Coordinates

DUID
Owner RWE Renewables Australia Pty Ltd
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
14 Jun 2026 17:45 → 15 Jun 2026 17:45 AEST

Dispatch & revenue

14 Jun 2026 17:45 → 15 Jun 2026 17:45 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.51/MWh
Capex total (greenfield)

How this was derived
Government referral confirms development stage and scale, but does not provide total project cost.

Reference
Referral summary · EPBC Act Public Portal (medium confidence)
Source recorded 06 Jun 2026

Capex refurbishment
Capex / MW
$2,254,098

Shown in table
$2.25M (2026 real AUD)

Reported / source value
$2.20M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)

How this was derived
No verified benchmark or project-specific fixed O&M value was sourced in this pass.

Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh
$0.51

Shown in table
$0.51 (2026 real AUD)

Reported / source value
$0.50 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Internal fallback default supplied by user instructions; not externally verified.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
No plant-specific greenfield capex announcement was found in the searched official owner/government sources. The project remains in development/EPBC assessment as of the cited sources, so a commissioned capacity and project cost were not verifiable. Generic wind operating assumptions were not fully sourced here; only emissions intensity and indicative asset life were set. Fixed OPEX was left null because no project- or benchmark-specific source was verified in this search pass.

Sources