15 May 2026 23:00 → 14 Jun 2026 23:00 AEST
| Capex total (greenfield) |
$18.57M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,160,338
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$18,000
Shown in table |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No plant-specific greenfield capex announcement was found in web search. Current web results identified the asset and owner/capacity, but not a source-backed total project investment cost. AEMO/CSIRO benchmark capex was not used because the instruction prioritises project-specific capex and none was found in the retrieved sources. Carag Solar Farm appears in sources as a 16 MW solar asset owned by Enerparc Australia Pty Ltd; some sources also describe it as shelved/inferred, so commissioning status should be reviewed.