Capital 2 Wind Farm

Wind · Capital Wind Farm 2 Pty Ltd · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
134 MW
Researched capacity
Est. SRMC
$0.76/MWh
Key information
Capacity (AI)
134 MW

AEMO generator spreadsheet entry for Capital 2 Wind Farm lists 134.40 MW (used as the only available capacity figure; no alternative owner/planning-source capacity found in provided results).

AEMO status Publicly Announced
Project status Development (AI)

AEMO spreadsheet lists the asset as "Publicly Announced" and no public primary-source construction/commissioning evidence was found in the provided search results.

Coordinates

DUID
Owner Capital Wind Farm 2 Pty Ltd
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Equipment confidence low
Stats window
14 Jun 2026 04:45 → 15 Jun 2026 04:45 AEST

Dispatch & revenue

14 Jun 2026 04:45 → 15 Jun 2026 04:45 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
134 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.76/MWh
Capex total (greenfield)
$272.73M

Shown in table
$272.73M (2026 real AUD)

Reported / source value
$180.00M (2011 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Project-specific greenfield investment value for Capital II Wind Farm.

Reference
Final DGs Report_Capital II WF (high confidence)
Source recorded 05 Jun 2026

Capex refurbishment
Capex / MW derived
$2,029,221

Shown in table
$2.03M (2026 real AUD)

Reported / source value
$1.34M (2011 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$11.20M

Shown in table
$11.20M (2026 real AUD)

Reported / source value
$7.39M (2011 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$83,333

Shown in table
$83.3k (2026 real AUD)

Reported / source value
$55.0k (2011 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback default used because no plant-specific verified O&M data was found.

Variable OPEX / MWh
$0.76

Shown in table
$0.76 (2026 real AUD)

Reported / source value
$0.50 (2011 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback default used because no plant-specific verified O&M data was found.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026

Notes
Project-specific greenfield capex was found in NSW planning documentation for Capital II Wind Farm (originally 100 MW). The user-provided registered capacity is 134.4 MW, while Iberdrola currently describes the proposed project as 143.5 MW; the historic project approval and cost figure appear to correspond to the earlier ~100 MW configuration, so capex_per_mw is a simple division of the reported $180 million by 134.4 MW for consistency with the provided capacity, but this should be treated cautiously. No verified plant-specific operating cost data or commissioning date was found in the sources reviewed; default onshore wind O&M assumptions were used as fallback. The project may still be pre-construction / not yet commissioned in the reviewed sources.