Wind · Capital Wind Farm 2 Pty Ltd · Wind Turbine - Onshore
14 Jun 2026 04:45 → 15 Jun 2026 04:45 AEST
| Capex total (greenfield) |
$272.73M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,029,221
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$11.20M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$83,333
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.76
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Project-specific greenfield capex was found in NSW planning documentation for Capital II Wind Farm (originally 100 MW). The user-provided registered capacity is 134.4 MW, while Iberdrola currently describes the proposed project as 143.5 MW; the historic project approval and cost figure appear to correspond to the earlier ~100 MW configuration, so capex_per_mw is a simple division of the reported $180 million by 134.4 MW for consistency with the provided capacity, but this should be treated cautiously. No verified plant-specific operating cost data or commissioning date was found in the sources reviewed; default onshore wind O&M assumptions were used as fallback. The project may still be pre-construction / not yet commissioned in the reviewed sources.