Solar · Edify Energy Pty Ltd · Solar PV - Fixed
14 Jun 2026 06:05 → 15 Jun 2026 06:05 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,160,338
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$18,000
Shown in table |
| Variable OPEX / MWh default |
$0.20
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
Edify Energy’s project page and the EPBC referral confirm the Callide Solar Power Station is a 200 MW solar PV farm with a 200 MW/800 MWh BESS and indicate construction is anticipated to commence in FY2025/26, but no plant-specific greenfield capex figure was found in the searched official sources. Because no project-specific investment announcement was located, capex remains unfilled rather than substituted with a benchmark. The site page also describes a larger 240MWp solar PV + 200MW storage concept on the project webpage, while the EPBC referral and Banana Shire Council pages describe the referred/approved project as 200 MWac solar PV + 200 MW/800 MWh BESS; this may indicate an evolving design, so capacity-related assumptions should be reviewed before final modelling.