Callide Power Station Solar Farm

Solar · Edify Energy Pty Ltd · Solar PV - Fixed

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.20/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Edify Energy project announcement/search results unavailable; asset is still publicly announced and no evidence of construction, commissioning, or operation was found.

Coordinates

DUID
Owner Edify Energy Pty Ltd
Commissioned
Expected closure
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
14 Jun 2026 06:05 → 15 Jun 2026 06:05 AEST

Dispatch & revenue

14 Jun 2026 06:05 → 15 Jun 2026 06:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.20/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MW
$1,160,338

Shown in table
$1.16M (2026 real AUD)

Reported / source value
$1.10M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$18,000

Shown in table
$18.0k (2026 real AUD)

Variable OPEX / MWh default
$0.20

Shown in table
$0.20 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
Edify Energy’s project page and the EPBC referral confirm the Callide Solar Power Station is a 200 MW solar PV farm with a 200 MW/800 MWh BESS and indicate construction is anticipated to commence in FY2025/26, but no plant-specific greenfield capex figure was found in the searched official sources. Because no project-specific investment announcement was located, capex remains unfilled rather than substituted with a benchmark. The site page also describes a larger 240MWp solar PV + 200MW storage concept on the project webpage, while the EPBC referral and Banana Shire Council pages describe the referred/approved project as 200 MWac solar PV + 200 MW/800 MWh BESS; this may indicate an evolving design, so capacity-related assumptions should be reviewed before final modelling.