Callide Gas Peaker - KCI

Other Generators · CSE H2 Pty Ltd · Turbine - Other

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$2.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

No public construction/commissioning evidence found; AEMO status is only "Publicly Announced", which aligns with early-stage development.

Coordinates

DUID
Owner CSE H2 Pty Ltd
Commissioned
Expected closure
Closure date
Technology Turbine - Other
Fuel Other - Other
Equipment OEM
Equipment type / model gas peaker / turbine - other
Equipment confidence low
Stats window
13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST

Dispatch & revenue

13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Other
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$2.00/MWh
Capex total (greenfield)

How this was derived
No reliable project-specific capex announcement was found in the searched sources.

Capex refurbishment
Capex / MW
$2,109,705

Shown in table
$2.11M (2026 real AUD)

Reported / source value
$2.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh default
$2.00

Shown in table
$2.00 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No plant-specific greenfield capex announcement found in the searched sources. Publicly accessible sources confirmed the project exists, is announced, is owned by CSE H2 Pty Ltd, and is a 750 MW gas turbine project, but did not provide a total investment cost, commissioning date, or operating assumptions. Internal fallback values were not applied because the request prioritised source-backed research and no benchmark source was searched/found here.

Sources