Wind · ARK Energy Corporation Pty Ltd · Wind Turbine - Onshore
14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST
| Capex total (greenfield) |
$873.36M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,012,356
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$26.06M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$60,044
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.55
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Plant-specific greenfield construction cost was identified in the Burrendong Wind Farm Economic Impact Assessment as approximately A$800 million (nominal, 2023). Ark Energy materials confirm the project is a 70-turbine, 400-500 MW onshore wind farm in NSW; the capacity used here is the user-supplied 434 MW. No separate plant-specific refurbishment capex was found. For operating assumptions, onshore wind uses zero fuel, zero direct emissions, no heat rate, and a 25-year design life per AEMO/Aurecon GenCost technical parameters; the fixed OPEX provided in the prompt was used as fallback because no project-specific O&M data was found.