Burrendong Wind Farm

Wind · ARK Energy Corporation Pty Ltd · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
434 MW
Researched capacity
Est. SRMC
$0.55/MWh
Key information
Capacity (AI)
434 MW

AEMO spreadsheet entry for Burrendong Wind Farm lists 434.00 MW (user-provided source; no corroborating public project announcement found in search results).

AEMO status Publicly Announced
Project status Development (AI)

No public project-specific source found beyond AEMO 'Publicly Announced'; treated as pre-construction/development due to lack of evidence of construction or commissioning.

Coordinates

DUID
Owner ARK Energy Corporation Pty Ltd
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
14 Jun 2026 01:35 → 15 Jun 2026 01:35 AEST

Dispatch & revenue

14 Jun 2026 01:35 → 15 Jun 2026 01:35 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
434 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.55/MWh
Capex total (greenfield)
$873.36M

Shown in table
$873.36M (2026 real AUD)

Reported / source value
$800.00M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
This is the plant-specific reported total construction cost for Burrendong Wind Farm.

Reference
Burrendong Wind Farm Economic Impact Assessment (high confidence)
Source recorded 05 Jun 2026

Capex refurbishment
Capex / MW derived
$2,012,356

Shown in table
$2.01M (2026 real AUD)

Reported / source value
$1.84M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Capex per MW is derived using the user-supplied 434 MW capacity.

Reference
Burrendong Wind Farm Economic Impact Assessment (high confidence)
Source recorded 05 Jun 2026

Fixed OPEX (annual)
$26.06M

Shown in table
$26.06M (2026 real AUD)

Reported / source value
$23.87M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$60,044

Shown in table
$60.0k (2026 real AUD)

Reported / source value
$55.0k (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific O&M was found; the user-provided fallback was used.

Variable OPEX / MWh
$0.55

Shown in table
$0.55 (2026 real AUD)

Reported / source value
$0.50 (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific variable O&M was found; the user-provided fallback was used.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026

Notes
Plant-specific greenfield construction cost was identified in the Burrendong Wind Farm Economic Impact Assessment as approximately A$800 million (nominal, 2023). Ark Energy materials confirm the project is a 70-turbine, 400-500 MW onshore wind farm in NSW; the capacity used here is the user-supplied 434 MW. No separate plant-specific refurbishment capex was found. For operating assumptions, onshore wind uses zero fuel, zero direct emissions, no heat rate, and a 25-year design life per AEMO/Aurecon GenCost technical parameters; the fixed OPEX provided in the prompt was used as fallback because no project-specific O&M data was found.