Wind · Iberdrola Australia Development Pty Limited · Wind Turbine - Onshore
01 Jun 2026 00:00 → 15 Jun 2026 01:00 AEST
| Capex total (greenfield) |
$835.44M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh default |
$0.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capex announcement was found in the searched official/developer/government sources. Public Iberdrola Australia materials and the NEM listing confirm Burrenbring Wind Farm exists as a proposed 360 MW onshore wind project under Iberdrola Australia Development Pty Limited, but the accessible sources reviewed did not disclose total project investment/capital cost. A separate Iberdrola document confirms the Burrenbring Battery is a different project, and should not be conflated with the wind farm.