Burrenbring Wind Farm

Wind · Iberdrola Australia Development Pty Limited · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
360 MW
Researched capacity
Est. SRMC
$0.50/MWh
Key information
Capacity (AI)
360 MW

AEMO spreadsheet entry for Burrenbring Wind Farm lists 360.00 MW (used as a fallback because no published owner/planning capacity source was found in the provided results).

AEMO status Publicly Announced
Project status Development (AI)

AEMO registration status is Publicly Announced; no independent project-phase source was available from the provided search results.

Coordinates

DUID
Owner Iberdrola Australia Development Pty Limited
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
13 Jun 2026 16:45 → 14 Jun 2026 16:45 AEST

Dispatch & revenue

13 Jun 2026 16:45 → 14 Jun 2026 16:45 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
360 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.50/MWh
Capex total (greenfield)
$835.44M

Shown in table
$835.44M (2026 real AUD)

Reported / source value
$792.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$0.50

Shown in table
$0.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No plant-specific greenfield capex announcement was found in the searched official/developer/government sources. Public Iberdrola Australia materials and the NEM listing confirm Burrenbring Wind Farm exists as a proposed 360 MW onshore wind project under Iberdrola Australia Development Pty Limited, but the accessible sources reviewed did not disclose total project investment/capital cost. A separate Iberdrola document confirms the Burrenbring Battery is a different project, and should not be conflated with the wind farm.

Sources