13 Jun 2026 13:00 → 14 Jun 2026 13:00 AEST
| Capex total (greenfield) |
$15.78M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,254,098
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$394.5k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$56,352
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.51
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capex could be verified from Pacific Hydro, government, or other primary sources in the searches performed. Used server-side fallback operating assumptions for onshore wind. Commissioning date not verified.