Wind · Windlab Developments Pty Ltd · Wind Turbine - Onshore
14 Jun 2026 08:45 → 15 Jun 2026 08:45 AEST
| Capex total (greenfield) |
$3,900.00M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,785,714
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$7.70M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$55,000
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.50
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Bungaban is a 1.4 GW onshore wind project. A project FAQ states the project is '$3.9 billion' and 1.4GW, which I used as the reported greenfield total project investment. Capacity was inferred from the project size; fixed OPEX used the provided default because no project-specific operating cost was found. Fixed OPEX annual value equals 55,000 AUD/MW-yr × 1,400 MW = 77,000,000 AUD/yr.