BESS · Genaspi Energy Group Pty Ltd · Storage - Battery
13 Jun 2026 09:20 → 14 Jun 2026 09:20 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$358,607
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$3.07M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$10,246
Shown in table Reported / source value |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capex announcement was found in the searched owner/developer, project, government, or market sources. Bundey is publicly described as a staged hybrid project; sources consistently indicate 300 MW / 1,200 MWh for Stage 1 battery, while the full project is described as 1,200 MW / 3,900 MWh across four stages. In the absence of a reported project cost, battery capex was left unset rather than substituting a benchmark. OPEX and technical assumptions were inferred from AEMO/GHD utility-scale BESS benchmark assumptions (200 MW / 800 MWh reference project) and scaled to 300 MW for a conservative planning default; these should be reviewed if a project-specific EPC/O&M package becomes available.