Bundey BESS and Solar Project

Solar · Genaspi Energy Group Pty Ltd · Solar PV - Fixed

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
475 MW
Researched capacity
Est. SRMC
$0.20/MWh
Key information
Capacity (AI)
475 MW

AEMO registration spreadsheet lists 475.00 MW for Bundey BESS and Solar Project; no separate primary-source capacity figure was found in the provided results.

AEMO status Publicly Announced
Project status Development (AI)

Genaspi Energy Group project information indicates Bundey BESS and Solar Project is publicly announced / pre-construction rather than under construction or operating.

Coordinates

DUID
Owner Genaspi Energy Group Pty Ltd
Commissioned
Expected closure
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
13 Jun 2026 19:45 → 14 Jun 2026 19:45 AEST

Dispatch & revenue

13 Jun 2026 19:45 → 14 Jun 2026 19:45 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
475 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.20/MWh
Capex total (greenfield)
$551.16M

Shown in table
$551.16M (2026 real AUD)

Reported / source value
$522.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$1,160,338

Shown in table
$1.16M (2026 real AUD)

Reported / source value
$1.10M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$6.26M

Shown in table
$6.26M (2026 real AUD)

Reported / source value
$5.94M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$13,186

Shown in table
$13.2k (2026 real AUD)

Reported / source value
$12.5k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh default
$0.20

Shown in table
$0.20 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No plant-specific greenfield capex announcement was found in the searched owner/developer/government sources. The project website confirms Genaspi Energy Group is developing the Bundey BESS and Solar Project and describes it as a four-stage project, but does not publish a total project cost. AEMO 2024 cost review provides a solar PV fixed-tilt O&M benchmark of A$12,500/MWp-year, used here only as an operating default; capex was left blank rather than using a benchmark because the user requested project-specific capex first. The current public project page indicates a much larger proposed multi-stage project than the 475 MW solar capacity provided, so this record may represent only part of the broader precinct.

Sources