Bullyard Solar Farm

Solar · EE Solar 9 Pty Ltd as trustee for the EE Solar 9 Trust · Solar PV - Single axis tracking

Development AEMO: Anticipated Solar - Solar NEM data · 24 hours
97 MW
Researched capacity
Est. SRMC
$0.25/MWh
Key information
Capacity (AI)
97 MW

AEMO spreadsheet (site listing) indicates 97.00 MW; no separate public announcement for Bullyard Solar Farm capacity was located in the provided search results.

AEMO status Anticipated
Project status Development (AI)

No public build/commissioning evidence found; AEMO listing shows the site as Anticipated, which is consistent with a development-stage project.

Coordinates

DUID
Owner EE Solar 9 Pty Ltd as trustee for the EE Solar 9 Trust
Commissioned
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
21 Jun 2026 08:30 → 22 Jun 2026 08:30 AEST

Dispatch & revenue

21 Jun 2026 08:30 → 22 Jun 2026 08:30 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
97 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield)
$133.02M

Shown in table
$133.02M (2026 real AUD)

Reported / source value
$126.10M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No plant-specific greenfield capex announcement was found in the searched owner/developer and project sources. European Energy identifies Bullyard as a 97 MWac solar farm in Bucca/Bullyard with construction expected to start mid-2026 and target grid connection in 2028, but no total project investment value was published in the retrieved sources. Because no reported capex was located, no benchmark fallback values were populated here. The project appears to be under development; commissioned/online date not found in source material.

Sources