Solar · EE Solar 9 Pty Ltd as trustee for the EE Solar 9 Trust · Solar PV - Single axis tracking
21 Jun 2026 08:30 → 22 Jun 2026 08:30 AEST
| Capex total (greenfield) |
$133.02M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,371,308
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table |
| Variable OPEX / MWh default |
$0.25
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capex announcement was found in the searched owner/developer and project sources. European Energy identifies Bullyard as a 97 MWac solar farm in Bucca/Bullyard with construction expected to start mid-2026 and target grid connection in 2028, but no total project investment value was published in the retrieved sources. Because no reported capex was located, no benchmark fallback values were populated here. The project appears to be under development; commissioned/online date not found in source material.