Bulli Creek Solar Farm

Solar · Genex Power Limited · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.26/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Genex Power project description / public references indicate Bulli Creek Solar Farm is proposed or in pre-construction planning stage (Genex Power website / public project materials).

Coordinates

DUID
Owner Genex Power Limited
Commissioned
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM unknown
Module / inverter supplier unknown
Inverter OEM unknown
Inverter model unknown
Stats window
14 Jun 2026 05:15 → 15 Jun 2026 05:15 AEST

Dispatch & revenue

14 Jun 2026 05:15 → 15 Jun 2026 05:15 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.26/MWh
Capex total (greenfield)

How this was derived
Primary-source search found no reported plant-specific total investment figure for the revised BC1.

Reference
Bulli Creek 1 Project - Genex (low confidence)
Source recorded 05 Jun 2026

Capex refurbishment
Capex / MW
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh
$0.26

Shown in table
$0.26 (2026 real AUD)

Reported / source value
$0.25 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Applied the user-provided internal fallback because no plant-specific O&M source was found.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No plant-specific greenfield capital cost for Bulli Creek Solar Farm was found in official Genex, government, or primary-source search results. Current Genex materials describe the project as a 775 MW first stage in the Bulli Creek Clean Energy Park, but do not disclose total construction cost. Because no reported capex figure was located, capex fields remain null rather than using AEMO/CSIRO benchmarks. The project appears to have evolved from an earlier 775 MW solar-first stage to a revised 300 MW solar + 425 MW/1,700 MWh hybrid BC1 configuration targeting CY2028; the user-specified normalised type was retained as solar_tracking for the original solar farm record.

Sources