Solar · Genex Power Limited · Solar PV - Single axis tracking
14 Jun 2026 05:15 → 15 Jun 2026 05:15 AEST
| Capex total (greenfield) |
—
How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,371,308
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table |
| Variable OPEX / MWh |
$0.26
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capital cost for Bulli Creek Solar Farm was found in official Genex, government, or primary-source search results. Current Genex materials describe the project as a 775 MW first stage in the Bulli Creek Clean Energy Park, but do not disclose total construction cost. Because no reported capex figure was located, capex fields remain null rather than using AEMO/CSIRO benchmarks. The project appears to have evolved from an earlier 775 MW solar-first stage to a revised 300 MW solar + 425 MW/1,700 MWh hybrid BC1 configuration targeting CY2028; the user-specified normalised type was retained as solar_tracking for the original solar farm record.