Solar · Bulli Creek Hybrid Nominee Pty Ltd on behalf of Bulli Creek Hybrid Trust · Solar PV - Fixed
14 Jun 2026 00:00 → 14 Jun 2026 23:50 AEST
| Capex total (greenfield) |
$522.15M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,160,338
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$8.54M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$18,987
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.21
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No reliable plant-specific greenfield capex was found for the Bulli Creek Solar Farm / Bulli Creek Stage 1 project under the named owner entity. Genex’s current project page describes Bulli Creek 1 as a 300MW solar + 425MW/1,700MWh BESS hybrid targeting FID/construction in CY2028, while earlier Genex releases described a 775MW solar stage targeting operation in 2027. Because the user-specified 450MW solar asset could not be matched cleanly to a verified plant-specific investment figure, capex remains unfilled rather than using benchmark estimates. Fixed OPEX and variable OPEX were left at internal defaults as fallback values.