Bridle Track Solar Project

Solar · ACEN Renewables · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
300 MW
Researched capacity
Est. SRMC
$0.31/MWh
Key information
Capacity (AI)
300 MW

AEMO spreadsheet (user-provided) shows 300.00 MW for Bridle Track Solar Project; no separate storage capacity identified for this solar PV project.

AEMO status Publicly Announced
Project status Development (AI)

AEMO spreadsheet lists the asset as Publicly Announced; in the absence of build/commissioning evidence from project announcements, this indicates an early-stage development project rather than an operating asset.

Coordinates

DUID
Owner ACEN Renewables
Commissioned
Expected closure 2051
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Equipment confidence low
Stats window
13 Jun 2026 13:35 → 14 Jun 2026 13:35 AEST

Dispatch & revenue

13 Jun 2026 13:35 → 14 Jun 2026 13:35 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
300 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.31/MWh
Capex total (greenfield)
$406.72M

Shown in table
$406.72M (2026 real AUD)

Reported / source value
$327.00M (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Secondary market-data source reporting the project cost estimate used for capex due to lack of a plant-specific official announcement in accessible results.

Reference
Bridle Track Solar Project, Australia (medium confidence)
Source recorded 05 Jun 2026

Capex refurbishment
Capex / MW derived
$1,355,721

Shown in table
$1.36M (2026 real AUD)

Reported / source value
$1.09M (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived capex per MW from the reported project cost and site capacity.

Reference
Bridle Track Solar Project, Australia (medium confidence)
Source recorded 05 Jun 2026

Fixed OPEX (annual)
$7.46M

Shown in table
$7.46M (2026 real AUD)

Reported / source value
$6.00M (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$24,876

Shown in table
$24.9k (2026 real AUD)

Reported / source value
$20.0k (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback default used because no plant-specific O&M source was identified in search results.

Variable OPEX / MWh
$0.31

Shown in table
$0.31 (2026 real AUD)

Reported / source value
$0.25 (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback default used because no plant-specific variable O&M source was identified in search results.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026

Notes
Project-specific capex could not be verified from an official owner/developer announcement in the available search results. A secondary market-data source reports an expected project cost of about A$327 million for the 300 MW Bridle Track Solar Project; this was used as reported capex. No refurbishment cost identified. Fixed OPEX uses server default fallback.

Sources