Brewongle Solar Farm

Solar · Edify Energy Pty Ltd · Solar PV - Fixed

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
100 MW
Researched capacity
Est. SRMC
$0.26/MWh
Key information
Capacity (AI)
100 MW

AEMO spreadsheet entry provided in prompt: 100.00 MW (used only as fallback because no project-specific capacity source was returned).

AEMO status Publicly Announced
Project status Development (AI)

No web results returned; inferred from AEMO status 'Publicly Announced' and absence of commissioning/operational evidence.

Coordinates

DUID
Owner Edify Energy Pty Ltd
Commissioned
Expected closure
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
13 Jun 2026 17:10 → 14 Jun 2026 17:10 AEST

Dispatch & revenue

13 Jun 2026 17:10 → 14 Jun 2026 17:10 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
100 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.26/MWh
Capex total (greenfield)
$188.80M

Shown in table
$188.80M (2026 real AUD)

Reported / source value
$145.00M (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
This is the project-specific greenfield construction/investment cost for the Brewongle Solar Farm proposal.

Reference
Report (Brewongle Solar Farm PEA / planning documentation) (high confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MW derived
$1,888,021

Shown in table
$1.89M (2026 real AUD)

Reported / source value
$1.10M (2019 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$23,438

Shown in table
$23.4k (2026 real AUD)

Reported / source value
$18.0k (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific fixed OPEX value was located; internal default used per instructions.

Variable OPEX / MWh
$0.26

Shown in table
$0.26 (2026 real AUD)

Reported / source value
$0.20 (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable OPEX value was located; internal default used per instructions.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026

Notes
Project-specific greenfield capital investment value of $145 million was identified in NSW planning documentation for Brewongle Solar Farm (131.2 MW PV). The site is now being progressed by Edify Energy on the same location, with current project materials describing 108 MWp installed capacity and early development status; the original Photon Energy proposal is the relevant reported capex source. Fixed OPEX was not found as plant-specific data, so internal default fallback was used. No refurbishment costs identified.

Sources