Brewongle Solar Farm

Solar · Edify Energy Pty Ltd · Solar PV - Fixed

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.26/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

DUID
Owner Edify Energy Pty Ltd
Commissioned
Expected closure
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
03 Jun 2026 22:25 → 04 Jun 2026 22:25 AEST

Dispatch & revenue

03 Jun 2026 22:25 → 04 Jun 2026 22:25 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.26/MWh
Capex total (greenfield)
$188.80M

Shown in table
$188.80M (2026 real AUD)

Reported / source value
$145.00M (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
This is the project-specific greenfield construction/investment cost for the Brewongle Solar Farm proposal.

Reference
Report (Brewongle Solar Farm PEA / planning documentation) (high confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MW
$1,437,083

Shown in table
$1.44M (2026 real AUD)

Reported / source value
$1.10M (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$23,438

Shown in table
$23.4k (2026 real AUD)

Reported / source value
$18.0k (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific fixed OPEX value was located; internal default used per instructions.

Variable OPEX / MWh
$0.26

Shown in table
$0.26 (2026 real AUD)

Reported / source value
$0.20 (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable OPEX value was located; internal default used per instructions.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026

Notes
Project-specific greenfield capital investment value of $145 million was identified in NSW planning documentation for Brewongle Solar Farm (131.2 MW PV). The site is now being progressed by Edify Energy on the same location, with current project materials describing 108 MWp installed capacity and early development status; the original Photon Energy proposal is the relevant reported capex source. Fixed OPEX was not found as plant-specific data, so internal default fallback was used. No refurbishment costs identified.

Sources