Bracewell Energy Park

Solar · TE H2 Australia · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.26/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

DUID
Owner TE H2 Australia
Commissioned Jul 2031
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
03 Jun 2026 20:50 → 04 Jun 2026 20:50 AEST

Dispatch & revenue

03 Jun 2026 20:50 → 04 Jun 2026 20:50 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.26/MWh
Capex total (greenfield)
$685.80M

Shown in table
$685.80M (2026 real AUD)

Reported / source value
$650.14M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$10.55M

Shown in table
$10.55M (2026 real AUD)

Reported / source value
$10.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$21,097

Shown in table
$21.1k (2026 real AUD)

Reported / source value
$20.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific O&M source was found; retained server-side fallback as instructed.

Variable OPEX / MWh
$0.26

Shown in table
$0.26 (2026 real AUD)

Reported / source value
$0.25 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M source was found; retained server-side fallback as instructed.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026

Notes
No plant-specific greenfield capex announcement for Bracewell Energy Park (solar PV single-axis tracking) was found in the searched owner/developer and official sources. The TE H2 site materials identified Bracewell/East End as a 500MW project near Bracewell, but the accessible materials found were for a battery storage proposal and did not provide a solar-park construction cost. O&M and asset-life values therefore use server defaults/industry heuristics for utility-scale solar PV with single-axis tracking; single-axis tracking is noted by AEMO as higher-cost than fixed tilt. The fixed OPEX annual figure is the default rate multiplied by 500.11 MW.