Boree Solar Project

Solar · Venn Energy Pty Ltd · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 7 days
180 MW
Researched capacity
Est. SRMC
$0.25/MWh
Key information
Capacity (AI)
180 MW

AEMO spreadsheet entry for Boree Solar Project (provided in prompt): 180.40 MW; no verified public source found to override this figure.

AEMO status Publicly Announced
Project status Development (AI)

No public project/web results were returned for Boree Solar Project; based on AEMO status only being Publicly Announced, the asset is best treated as pre-construction/development.

Coordinates

DUID
Owner Venn Energy Pty Ltd
Commissioned
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Equipment confidence low
Stats window
08 Jun 2026 09:45 → 15 Jun 2026 09:45 AEST

Dispatch & revenue

08 Jun 2026 09:45 → 15 Jun 2026 09:45 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
180 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield)
$300.67M

Shown in table
$300.67M (2026 real AUD)

Reported / source value
$234,520.40M (2020 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

Capex refurbishment
Capex / MW derived
$1,666,667

Shown in table
$1.67M (2026 real AUD)

Reported / source value
$1.30M (2020 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO/Aurecon 2020 review provides the solar PV benchmark structure and fixed O&M; CAPEX $/MW for solar PV tracking was populated using the provided internal default because the exact single-axis tracking CAPEX line item was not extracted from the accessed excerpt. Fixed O&M per MW is directly supported by the PDF excerpt.

Reference
Aurecon (for AEMO) 2020 Costs and Technical Parameter Review (Revision 3) (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX (annual)
$3.93M

Shown in table
$3.93M (2026 real AUD)

Reported / source value
$3,069.15M (2020 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

Fixed OPEX / MW-yr
$21,782

Shown in table
$21.8k (2026 real AUD)

Reported / source value
$17.0k (2020 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Solar PV benchmark fixed O&M per MW-yr is 16,990 and variable O&M is included in the fixed component in the report.

Reference
Aurecon (for AEMO) 2020 Costs and Technical Parameter Review (Revision 3) (high confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

How this was derived
Variable O&M is included in fixed O&M for the benchmark, so separate variable O&M per MWh is not populated.

Reference
Aurecon (for AEMO) 2020 Costs and Technical Parameter Review (Revision 3) (medium confidence)
Source recorded 04 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 04 Jun 2026

Notes
Plant-specific commissioning date and any brownfield upgrades were not found in the web sources retrieved. Solar PV benchmark values for CAPEX ($/MW net) and fixed O&M ($/MW-yr net) are taken from AEMO/Aurecon 2020 Costs and Technical Parameter Review. Variable O&M is modelled as included in the fixed component in the source (therefore no separate variable O&M per MWh is provided). Emissions intensity set to zero for solar generation.