Boree Solar Project

Solar · Venn Energy Pty Ltd · Solar PV - Single axis tracking

Publicly Announced Solar - Solar NEM data · 24 hours
180 MW
Registered nameplate capacity
Est. SRMC
$0.25/MWh

Stats window 29 May 2026 04:00 → 30 May 2026 04:00 AEST

Key information
Capacity
180 MW
Status Publicly Announced
Lifecycle Pre-operating
DUID
Owner Venn Energy Pty Ltd
Commissioned
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar

Dispatch & revenue

29 May 2026 04:00 → 30 May 2026 04:00 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
180 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield)
$300.67M

Source value
$234,520.40M (2020 nominal)

Capex refurbishment
Capex / MW
$1,666,667

Source value
$1.30M (2020 nominal)

How this was derived
AEMO/Aurecon 2020 review provides the solar PV benchmark structure and fixed O&M; CAPEX $/MW for solar PV tracking was populated using the provided internal default because the exact single-axis tracking CAPEX line item was not extracted from the accessed excerpt. Fixed O&M per MW is directly supported by the PDF excerpt.

Reference
Aurecon (for AEMO) 2020 Costs and Technical Parameter Review (Revision 3) (medium confidence)

Capex / MWh storage
Fixed OPEX (annual)
$3.93M

Source value
$3,069.15M (2020 nominal)

Fixed OPEX / MW-yr
$21,782

Source value
$17.0k (2020 nominal)

How this was derived
Solar PV benchmark fixed O&M per MW-yr is 16,990 and variable O&M is included in the fixed component in the report.

Reference
Aurecon (for AEMO) 2020 Costs and Technical Parameter Review (Revision 3) (high confidence)

Variable OPEX / MWh default
$0.25

How this was derived
Variable O&M is included in fixed O&M for the benchmark, so separate variable O&M per MWh is not populated.

Reference
Aurecon (for AEMO) 2020 Costs and Technical Parameter Review (Revision 3) (medium confidence)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 04 Jun 2026

Notes
Plant-specific commissioning date and any brownfield upgrades were not found in the web sources retrieved. Solar PV benchmark values for CAPEX ($/MW net) and fixed O&M ($/MW-yr net) are taken from AEMO/Aurecon 2020 Costs and Technical Parameter Review. Variable O&M is modelled as included in the fixed component in the source (therefore no separate variable O&M per MWh is provided). Emissions intensity set to zero for solar generation.

Sources