Wind · Arup Australia Pty Ltd · Wind Turbine - Offshore
13 Jun 2026 09:00 → 14 Jun 2026 09:00 AEST
| Capex total (greenfield) |
$6,413.11M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$6,413,115
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$90,000
Shown in table |
| Variable OPEX / MWh default |
$0.80
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 06 Jun 2026
Notes
No plant-specific greenfield investment figure was found for Blue Mackerel North. Capex uses AEMO/GHD 2025 fixed-foundation offshore wind benchmark ($5,216/kW net, incl. 2% Australian market premium) for a 1,000 MW project; this is an estimated fallback, not a reported project cost. Offshore wind operating cost assumptions were not populated because the search results retrieved only capex-oriented benchmark material and no verified project-specific O&M values.