Blind Creek Solar Farm and Battery Energy Storage System

Solar · Ms BCSF Holdings Pty Ltd as trustee for the Blind Creek Solar Farm Trust · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 22h
378 MW
Researched capacity
Est. SRMC
$0.25/MWh
Key information
Capacity (AI)
378 MW

AEMO spreadsheet entry for Blind Creek Solar Farm and Battery Energy Storage System (DUID blank) shows 378.00 MW announced capacity.

AEMO status Publicly Announced
Project status Development (AI)

AEMO spreadsheet lists the asset as "Publicly Announced", indicating it is still in development rather than operational.

Coordinates

DUID
Owner Ms BCSF Holdings Pty Ltd as trustee for the Blind Creek Solar Farm Trust
Commissioned
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
14 Jun 2026 00:00 → 14 Jun 2026 22:05 AEST

Dispatch & revenue

14 Jun 2026 00:00 → 14 Jun 2026 22:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
378 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield)
$518.35M

Shown in table
$518.35M (2026 real AUD)

Reported / source value
$491.40M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026

Notes
Generator-level commissioned/online date and DUID not provided. AEMO/CSIRO benchmark values for solar PV (single-axis tracking) and associated O&M variable cost were not fully extracted in the available sources; therefore server-side defaults should be replaced once the relevant AEMO benchmark tables are located for large-scale (utility-scale) single-axis tracking (and aligned to MW vs MWp).

Sources