Solar · TerraCom Ltd · Solar PV - Fixed
16 May 2026 04:45 → 15 Jun 2026 04:45 AEST
| Capex total (greenfield) |
$91.16M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,519,337
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.49M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$24,862
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.28
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
I found TerraCom’s 2016 announcement that it planned to investigate a 60 MW solar power station at Blair Athol, and TerraCom still describes Blair Athol as an operational mine site. However, I did not find a project-specific construction/investment cost for the solar station in official owner, government, or finance sources, so capex remains unfilled rather than using a benchmark as reported capex. O&M and performance defaults were therefore used from AEMO/Aurecon 2024 utility-scale solar PV benchmark assumptions.