Blair Athol Solar Power Station

Solar · TerraCom Ltd · Solar PV - Fixed

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
60 MW
Researched capacity
Est. SRMC
$0.28/MWh
Key information
Capacity (AI)
60 MW

AEMO spreadsheet indicates 60.00 MW; no reliable primary-source capacity announcement was found in the available web results to verify a different figure.

AEMO status Publicly Announced
Project status Development (AI)

TerraCom Ltd project references describe Blair Athol Solar Power Station as a proposed/publicly announced solar PV project, with no evidence found of construction or commissioning.

Coordinates

DUID
Owner TerraCom Ltd
Commissioned
Expected closure
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Equipment confidence low
Stats window
14 Jun 2026 07:55 → 15 Jun 2026 07:55 AEST

Dispatch & revenue

14 Jun 2026 07:55 → 15 Jun 2026 07:55 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
60 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.28/MWh
Capex total (greenfield)
$91.16M

Shown in table
$91.16M (2026 real AUD)

Reported / source value
$66.00M (2016 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
The official announcement is a plans/investigation release and does not disclose a capex figure.

Reference
Blair Athol – 60Mw Solar Power Station Plans (medium confidence)
Source recorded 05 Jun 2026

Capex refurbishment
Capex / MW derived
$1,519,337

Shown in table
$1.52M (2026 real AUD)

Reported / source value
$1.10M (2016 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$1.49M

Shown in table
$1.49M (2026 real AUD)

Reported / source value
$1.08M (2016 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$24,862

Shown in table
$24.9k (2026 real AUD)

Reported / source value
$18.0k (2016 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Utility-scale solar PV O&M benchmark table provides fixed O&M values by configuration; I used the fixed-tilt solar PV default already supplied by the server-side fallback.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 05 Jun 2026

Variable OPEX / MWh
$0.28

Shown in table
$0.28 (2026 real AUD)

Reported / source value
$0.20 (2016 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
The solar PV benchmark source was used for operating assumptions; the specific extracted variable O&M line was not clearly visible in the returned snippet, so confidence is medium.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 05 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
I found TerraCom’s 2016 announcement that it planned to investigate a 60 MW solar power station at Blair Athol, and TerraCom still describes Blair Athol as an operational mine site. However, I did not find a project-specific construction/investment cost for the solar station in official owner, government, or finance sources, so capex remains unfilled rather than using a benchmark as reported capex. O&M and performance defaults were therefore used from AEMO/Aurecon 2024 utility-scale solar PV benchmark assumptions.