Beelbee Solar Farm

Solar · Darling Downs Solar Farm Pty Ltd · Solar PV - Single axis tracking

Publicly Announced Solar - Solar NEM data · 24 hours
200 MW
Registered nameplate capacity
Est. SRMC
$0.00/MWh
Key information
Capacity
200 MW
Status Publicly Announced
Lifecycle Pre-operating
DUID
Owner Darling Downs Solar Farm Pty Ltd
Commissioned
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
03 Jun 2026 16:45 → 04 Jun 2026 16:45 AEST

Dispatch & revenue

03 Jun 2026 16:45 → 04 Jun 2026 16:45 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
200 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$292.56M

Shown in table
$292.56M (2026 real AUD)

How this was derived
Best project-specific capex source found. It reports nominal construction cost but the scope differs from the current 200 MW project record and may include development staging and potential battery optionality.

Reference
Western Downs Development Status Report January 2019 (medium confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MW
$1,462,800

Shown in table
$1.46M (2026 real AUD)

How this was derived
Per-MW capex is a calculation from the reported AUD 395m and 240 MW source scope. Confidence is low because project capacity is reported inconsistently across sources.

Reference
Western Downs Development Status Report January 2019 (low confidence)
Source recorded 04 Jun 2026

Capex / MWh storage
Fixed OPEX (annual)
$2.88M

Shown in table
$2.88M (2026 real AUD)

How this was derived
Used as a technology-default O&M assumption because no Beelbee-specific O&M contract or budget was found.

Reference
2024 Energy Technology Cost and Parameters Review (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX / MW-yr
$14,400

Shown in table
$14.4k (2026 real AUD)

How this was derived
Converted the AEMO/Aurecon DC-basis default to an AC MW-year figure for the 200 MW generator profile.

Reference
2024 Energy Technology Cost and Parameters Review (medium confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

How this was derived
Fuel cost is modelled as zero for solar PV because there is no combustible fuel input.

Reference
2024 Energy Technology Cost and Parameters Review (medium confidence)
Source recorded 04 Jun 2026

Heat rate GJ/MWh

How this was derived
No heat-rate assumption is required for PV technology.

Reference
2024 Energy Technology Cost and Parameters Review (medium confidence)
Source recorded 04 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 04 Jun 2026

Notes
No specific financial data found for Beelbee Solar Farm. All values are marked as unknown due to lack of available information.

Latest AI note (4 Jun 2026)

Beelbee Solar Farm is listed as publicly announced with 200 MW capacity, no DUID and no full commercial use date. No generator-specific construction cost, O&M, heat-rate/efficiency, emissions factor, or closure/refurbishment disclosure was found. Financial assumptions therefore use AEMO/Aurecon 2024 large-scale solar PV single-axis tracking hypothetical project values, which are an exact 200 MW AC / 240 MWp DC reference case. Capex total is estimated as EPC cost AUD 276.0m plus land and development AUD 16.56m = AUD 292.56m, equivalent to AUD 1.4628m/MW AC. Fixed O&M is source-reported as AUD 12,000/MWp DC-year and AUD 2.88m/year for 240 MWp; normalised here to AUD 14,400/MW AC-year for a 200 MW AC plant. VOM is set to 0 as a separate line item because Aurecon states variable O&M is included in fixed O&M. Heat rate and thermal efficiency are not applicable to solar PV. Direct operational emissions intensity is entered as 0 tCO2/MWh on the basis that solar PV uses no combusted fuel; lifecycle emissions are not included. Closure/decommissioning: GHD's 2025 AEMO retirement review uses a 200 MW AC single-axis tracking PV scenario, estimates technical/economic life at 30 years, notes possible 40-year operation if piles do not corrode and spare parts remain available, and estimates retirement cost at AUD 110,000/MW with about 22 weeks total retirement duration. Older public reporting conflicts on project size, citing 150 MW potential, 240 MW approved, or 250 MW; current AEMO-derived listings use 200 MW.

View 4 earlier AI notes
4 Jun 2026

Beelbee Solar Farm appears to remain a pre-construction/publicly announced project rather than an operating NEM generator: no DUID, online date, FID announcement, EPC contract, commissioning notice, expected closure year, or closure date was found. The best Beelbee-specific capex source found is a Western Downs regional development status report listing Darling Downs Solar Farm - Stage 2 at Beelbee with construction cost of AUD 395m for a 240 MW solar farm with potential 110 MW battery storage. This conflicts with the current 200 MW nameplate capacity in Global Energy Monitor and the user-provided generator record; capex_per_mw_aud is therefore calculated on the 240 MW reported capex scope, not the 200 MW current listing. Fixed O&M, variable O&M, fuel cost, asset life, heat-rate, efficiency and refurbishment assumptions are AEMO/Aurecon technology defaults for a 200 MW AC / 240 MWp DC single-axis tracking solar PV project, not Beelbee owner-reported values. Major refurbishment/closure: no Beelbee-specific refurbishment or closure plan was found; AEMO/Aurecon default design life is 30 years, with possible technical extension to about 40 years if piles do not corrode and spare parts remain available.

4 Jun 2026

Beelbee appears to remain publicly announced/pre-construction, with no DUID, full commercial use date, expected closure year or closure date found. The selected capex value is the most detailed Beelbee-specific construction-cost source found: Western Downs Development Status Report January 2019 lists Darling Downs Solar Farm - Stage 2 at Beelbee as a 240 MW solar farm with potential for 110 MW battery storage and construction cost of $395m. A separate TSBE renewables fact sheet gives a rounded '$400m Beelbee Solar Farm' figure; both are included. Capex per MW is calculated on the reported 240 MW scope to preserve the original source scope; if divided by the current 200 MW generator listing, it would be $1.975m/MW. O&M, variable O&M, fuel, life and refurbishment assumptions are AEMO/Aurecon technology-default assumptions for a 200 MW AC / 240 MWp DC single-axis tracking solar PV project, not Beelbee owner-reported values. Major refurbishment/closure: no Beelbee-specific refurbishment or closure notice was found; AEMO/Aurecon indicate 30-year life, possible extension to around 40 years subject to condition/spares, with midlife inverter refurbishment, tracker/pile works, substation sustaining capex and SCADA replacement likely life-extension items.

4 Jun 2026

Beelbee Solar Farm is listed as Publicly Announced / pre-construction with no DUID, no full commercial use date and no closure date located. The 2024 TSBE Western Downs Development Status Report lists Beelbee Solar Farm as approved and awaiting commencement with APA Group as proponent and a construction cost of AUD 200 million; this is used as the generator-specific nominal capex assumption for a 200 MW AC NEM listing. A conflicting older TSBE report describes Darling Downs Solar Farm Stage 2 at Beelbee as a 240 MW solar farm with potential battery storage and AUD 395 million construction cost; this may reflect a wider or earlier scope and is not used as the primary capex value. Fixed and variable O&M, asset life and technical assumptions are default/benchmark estimates from Aurecon's 2024 technology-cost review for AEMO for a 200 MW AC / 240 MWp single-axis tracking solar PV project. Heat rate is not applicable for solar PV. Emissions intensity is interpreted as operational/direct generation emissions, not lifecycle emissions.

4 Jun 2026

Beelbee Solar Farm appears in AEMO-derived generator lists as publicly announced / pre-construction rather than in service, with no DUID, full commercial use date, expected closure year, closure date, or final investment decision found. The best Beelbee-specific construction-cost source found is a regional development status report listing Darling Downs Solar Farm - Stage 2 / Beelbee as a 240 MW solar farm with potential battery storage and construction cost of $395m; this differs from the current AEMO/NEM listing capacity of 200 MW. Capex_per_mw_aud is therefore calculated on the reported 240 MW scope, not the 200 MW current listing. O&M, variable O&M, fuel, asset life and refurbishment assumptions are technology defaults from AEMO/Aurecon for a 200 MW AC / 240 MWp DC single-axis tracking solar PV project, not Beelbee owner-reported values. Major refurbishment/closure: no Beelbee-specific refurbishment or closure notice found; default solar PV life is 30 years, with possible extension to around 40 years if piles/spares remain suitable and with midlife inverter/tracker/substation refurbishment needs.