Beebo Solar Farm - KCI

Solar · BEEBO SOLAR FARM PTY LTD as Trustee For BEEBO SOLAR FARM UNIT TRUST · Solar PV - Fixed

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

DUID
Owner BEEBO SOLAR FARM PTY LTD as Trustee For BEEBO SOLAR FARM UNIT TRUST
Commissioned
Expected closure
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
03 Jun 2026 19:45 → 04 Jun 2026 19:45 AEST

Dispatch & revenue

03 Jun 2026 19:45 → 04 Jun 2026 19:45 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$877.68M

Shown in table
$877.68M (2026 real AUD)

How this was derived
AEMO/Aurecon provides a 2024 benchmark for large-scale single-axis-tracking solar PV. This was scaled to Beebo's 600 MW AC solar scope; the result is an estimate, not a reported project budget.

Reference
2024 Energy Technology Cost and Parameters Review (medium confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MW
$1,462,800

Shown in table
$1.46M (2026 real AUD)

How this was derived
Derived from the estimated solar-only total capex divided by Beebo's reported 600 MW AC capacity.

Reference
2024 Energy Technology Cost and Parameters Review (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX (annual)
$8.64M

Shown in table
$8.64M (2026 real AUD)

How this was derived
AEMO/Aurecon's 240 MWp benchmark fixed O&M was scaled to the assumed 720 MWp DC Beebo solar array.

Reference
2024 Energy Technology Cost and Parameters Review (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX / MW-yr
$14,400

Shown in table
$14.4k (2026 real AUD)

How this was derived
The reported benchmark is on a DC MWp basis; the profile field is converted to an AC MW basis for Beebo.

Reference
2024 Energy Technology Cost and Parameters Review (medium confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

How this was derived
Solar PV uses solar irradiance rather than purchased fuel, so no fuel cost or fuel supply contract is required.

Reference
2024 Energy Technology Cost and Parameters Review (high confidence)
Source recorded 04 Jun 2026

Heat rate GJ/MWh

How this was derived
Solar PV is not a heat-engine technology and therefore has no fuel heat rate.

Reference
2024 Energy Technology Cost and Parameters Review (high confidence)
Source recorded 04 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 04 Jun 2026

Notes
No specific financial data was found for Beebo Solar Farm - KCI; all entries are marked as unknown or not available.

Latest AI note (4 Jun 2026)

No generator-specific reported capex, O&M, PPA, financing, fuel contract, or refurbishment cost was found in public sources. Capex and O&M are estimated using AEMO/Aurecon 2024 large-scale solar PV benchmark assumptions, scaled to Beebo's reported 600 MW AC solar farm. Because Aurecon's benchmark is for single-axis tracking with a 1.2 DC:AC ratio, the estimate assumes 720 MWp DC for 600 MW AC. Estimated capex includes EPC plus land/development allowance from the benchmark and excludes the 400 MW/800 MWh standalone BESS, road upgrades, and any unusual project-specific grid augmentation not captured by the benchmark. Public EPBC documents list Beebo as a 600 MW solar farm with 400 MW/800 MWh BESS, single-axis tracker infrastructure, 15-18 month construction phase, and expected 40-year operational life. At end of life, EPBC documents state the solar farm will either be decommissioned or repowered; no major refurbishment cost is disclosed. Input technology label says fixed PV, but official EPBC referral text describes single-axis mounting framework/tracking equipment, so the normalised technology is set to solar_tracking and flagged for review.

View 4 earlier AI notes
4 Jun 2026

No public generator-specific construction cost, EPC contract value, fixed O&M contract, variable O&M contract, PPA/offtake price, financing terms, or refurbishment cost was found for Beebo Solar Farm - KCI. Capex and O&M values are therefore technology benchmark defaults from CSIRO/AEMO GenCost 2024-25 for large-scale solar PV, applied to the stated 600 MW capacity. The GenCost benchmark is for large-scale solar PV and notes that large-scale solar PV is single-axis tracking, while the provided NEMStats generator label says Solar PV - Fixed; EPBC referral material also refers to single-axis mounting framework for trackers. Total capex estimate excludes the separately proposed 400 MW / 800 MWh BESS, road upgrades, project-specific grid connection, land, financing, owner costs, and contingencies unless embedded in the benchmark. Asset life uses the Beebo EPBC referral's project-specific 40-year operational life; GenCost LCOE economic life for solar PV is 30 years and is also captured as a benchmark source. Closure/refurbishment notes: at end of operational phase, project would be decommissioned or upgraded and all infrastructure removed if decommissioned. Public EPBC portal status found during search indicated the project was under assessment with a controlled action referral decision and a January 2026 variation-to-proposal decision accepting added local road upgrades; this is not a final project investment decision or construction cost disclosure.

4 Jun 2026

Beebo is a proposed/under-assessment project, not an operating DUID. The capex value found is a reported whole-project construction cost for the combined 600 MW solar farm plus 400 MW/800 MWh standalone BESS, not a clean solar-only EPC value. The capex_per_mw_aud divides this reported whole-project cost by the stated 600 MW solar capacity and therefore overstates pure PV-only capex if the BESS is excluded. O&M values are technology-default assumptions from AEMO/Aurecon large-scale solar PV parameters, not Beebo-specific reported contract values. The generator record supplied by the user says Solar PV - Fixed, but the EPBC project description lists single-axis mounting framework/trackers and tracking equipment; this technology mismatch should be reviewed. Official EPBC material states construction includes operation and decommissioning, construction is expected to take approximately 15-18 months, operation life is expected to be 40 years, and at end of operational phase the solar farm will either be decommissioned or repowered. EPBC status observed as Under Assessment, so no closure date or refurbishment program is available.

4 Jun 2026

No generator-specific capex, O&M, financing, heat-rate, or fuel-contract disclosure was found for Beebo Solar Farm. Financial values are therefore default estimates using AEMO/Aurecon 2024 large-scale solar PV assumptions, scaled to 600 MW and excluding the separate 400 MW / 800 MWh BESS. AEMO/Aurecon benchmark is for a 240 MWp DC / 200 MW AC single-axis tracking project: EPC capex AUD 1.15/W DC plus land/development of AUD 16.56m on 240 MWp, giving AUD 1.219m/MWp total benchmark. Applied to 600 MW gives AUD 731.4m. Fixed O&M is AUD 12,000/MWp-year, giving AUD 7.2m/year at 600 MW. Variable O&M is included in fixed O&M, represented here as AUD 0/MWh separate VOM. Technology classification conflict: NEMStats/user input labels the generator as Solar PV - Fixed, while the EPBC referral description lists single-axis mounting framework for trackers and installation of tracking equipment; the financial assumptions used are therefore closer to solar_tracking. EPBC project is under assessment/publicly announced, not an operating generator. Major closure/refurbishment note: EPBC referral says expected operating life is 40 years, after which the project will either be decommissioned or repowered; decommissioning would remove above-ground infrastructure and rehabilitate the land, while transmission-network-operated assets such as a substation may remain.

4 Jun 2026

Beebo-specific project documents found in the EPBC portal confirm a 600 MW solar farm with 400 MW / 800 MWh standalone BESS, 15-18 month construction phase, 40-year operating life, and end-of-life decommissioning or repowering option. No source-backed Beebo-specific construction cost, fixed O&M, variable O&M, or financing data was located. Financial values are therefore default/estimated from CSIRO GenCost 2025-26 draft large-scale solar PV assumptions in 2025-26 AUD. The capex estimate applies to the 600 MW solar PV component only and excludes the 800 MWh BESS unless otherwise noted by future project disclosures. There is a technology classification conflict: the provided generator label/NEMStats entry says Solar PV - Fixed, but the EPBC project description lists single-axis mounting framework for trackers and CSIRO GenCost large-scale solar PV is single-axis tracking.