Barnawartha Solar & Energy Storage

Solar · Barnawartha Solar Pty Ltd · Solar PV - Single axis tracking

Operational AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
5 MW
Researched capacity
Est. SRMC
$0.00/MWh
Key information
Capacity (AI)
5 MW

pv magazine Australia (2024) stated the Barnawartha solar farm is 4.85 MW and uses LONGi modules.

AEMO status Publicly Announced
Project status Operational (AI)

pv magazine Australia (2024) reported Barnawartha solar farm was completed and energised.

Coordinates

DUID
Owner Barnawartha Solar Pty Ltd
Commissioned
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM LONGi
Module / inverter supplier module supplier
Inverter OEM Sungrow
Inverter model central inverter
Equipment confidence high
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
5 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$107.27M

Shown in table
$107.27M (2026 real AUD)

How this was derived
No Barnawartha-specific capex was found; the estimate applies AEMO/Aurecon's 2024 large-scale single-axis tracking PV EPC cost and development-cost assumptions to Gentari's 88 MWp DC capacity.

Reference
2024 Energy Technology Cost and Technical Parameter Review (low confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MW derived
$22,117,938

Shown in table
$22.12M (2026 real AUD)

How this was derived
Derived from the same AEMO/Aurecon capex assumptions and the 64.02 MW AC capacity supplied in the prompt; no reported Barnawartha capex per MW was found.

Reference
2024 Energy Technology Cost and Technical Parameter Review (low confidence)
Source recorded 04 Jun 2026

Fixed OPEX (annual)
$1.06M

Shown in table
$1.06M (2026 real AUD)

How this was derived
No Barnawartha-specific O&M contract price was found; the estimate applies AEMO/Aurecon's large-scale solar fixed O&M assumption to Gentari's 88 MWp DC capacity.

Reference
2024 Energy Technology Cost and Technical Parameter Review (low confidence)
Source recorded 04 Jun 2026

Fixed OPEX / MW-yr
$16,495

Shown in table
$16.5k (2026 real AUD)

How this was derived
Derived from AEMO/Aurecon's AUD 12,000/MWp-year fixed O&M assumption and the prompt's 64.02 MW AC capacity.

Reference
2024 Energy Technology Cost and Technical Parameter Review (low confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

How this was derived
AEMO/Aurecon does not assign a separate variable O&M cost for large-scale solar PV.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

How this was derived
The official project site describes the energy source as solar irradiation, so no combustible fuel cost or heat-content fuel contract applies.

Reference
Barnawartha Solar & Energy Storage (high confidence)
Source recorded 04 Jun 2026

Heat rate GJ/MWh

How this was derived
AEMO/Aurecon's solar PV technical parameters do not specify a heat rate because the technology is non-thermal.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 04 Jun 2026

Confidence: low · Status: ai estimated · Capex basis: estimated · AI checked 04 Jun 2026

Notes
No public project-specific EPC contract value, total capex, fixed O&M or variable O&M was found for Barnawartha Solar & Energy Storage. Capex is estimated for the solar PV component only, excluding the co-located BESS, using Aurecon/AEMO 2024 large-scale solar PV single-axis tracking benchmark: AUD 1.15/Wdc EPC plus land/development cost equal to 10% of equipment cost. Gentari reports 88 MWp installed solar capacity and 64 MW/2-hour BESS, while the project website and CIS list the solar component as approximately 64 MW AC and BESS as 64 MW / 148 MWh. Estimated solar capex = 88 MWp * AUD 1.219 million/MWp = AUD 107.27 million nominal 2024 basis; capex_per_mw_aud uses the user-provided 64.02 MW AC capacity. Fixed O&M is estimated as AUD 12,000/MWp-year * 88 MWp = AUD 1.056 million/year, converted to AUD/MW-year using 64.02 MW AC. Variable O&M is reported by the benchmark as included in fixed O&M and is therefore entered as 0. Direct operational emissions intensity for solar generation is assumed 0 tCO2/MWh; avoided-emissions claims are not used as stack emissions intensity. No generator DUID was found; project timeline indicates financial close in early 2026, construction mobilisation late 2026 and energisation/operation in 2027. Major end-of-life/closure notes are generic: large-scale solar PV retirement benchmark assumes decommissioning, dismantling and rehabilitation over about 22 weeks with retirement cost around AUD 110,000/MW at end of technical life.

Latest AI note (4 Jun 2026)

Barnawartha is under development, not yet operational. Official project sources state up to about 64 MW AC solar with battery storage; Gentari lists 88 MWp solar and 64 MW/2hr BESS, while AEMO Services' CIS Tender 1 table lists 64 MW generation and 148 MWh storage. No public project-specific capex, EPC contract value, O&M contract price, financing terms, fixed O&M, variable O&M, heat-rate/efficiency, or closure-cost values were found. The capex estimate is solar-only and excludes the co-located BESS: derived from AEMO/Aurecon 2024 large-scale single-axis tracking solar PV cost assumptions of AUD 1.15/Wdc EPC plus land/development cost equal to 10% of equipment cost, applied to Gentari's stated 88 MWp DC capacity. Fixed O&M is estimated from the same AEMO/Aurecon solar PV assumption of AUD 12,000/MWp-year, applied to 88 MWp. Capex per MW and fixed O&M per MW-year are expressed against 64.02 MW AC capacity supplied in the prompt. Variable O&M is set to zero because AEMO/Aurecon states it is included in fixed O&M. Heat rate and thermal efficiency are not applicable to solar PV. Emissions intensity is treated as direct operational Scope 1 intensity of 0 tCO2e/MWh, consistent with solar PV operation and CER solar facility reporting examples. Major refurbishment/closure notes: no project-specific refurbishment or closure plan was found; generic AEMO/GHD solar PV assumptions indicate 30-year economic life and solar PV retirement activities covering decommissioning, dismantling and rehabilitation.

View 1 earlier AI note
4 Jun 2026

No public generator-specific EPC contract price, project-finance capex, fixed O&M contract, or variable O&M contract was found. Capex is an estimate for the solar PV component only, excluding the 64 MW/148 MWh BESS and excluding the separate overhead line permit estimate. It is based on Gentari's reported 88 MWp solar capacity and Aurecon/AEMO 2024 NEM mid-size ground-mount single-axis-tracking solar assumptions: EPC cost AUD 1.30/Wdc plus land/development cost equal to 10% of equipment cost, where equipment is 60% of EPC. Using 88 MWp gives EPC AUD 114.4m plus land/development AUD 6.864m, total AUD 121.264m in nominal 2024 AUD. Capex per MW uses the user-provided 64.02 MW AC capacity. Fixed O&M uses AUD 12,000/MWp-year applied to 88 MWp. Variable O&M is treated as zero because the cited AEMO/Aurecon assumption states it is included in fixed O&M. Project status: under development; current project website indicates financial close in early 2026, construction mobilisation in late 2026, and energisation/site operational in 2027. DUID was not located in public search results, consistent with the project not yet being operational/registered in AEMO dispatch data as of the researched sources.

Sources