Banana Range Wind Farm

Wind · Orange Creek Energy Pty Ltd · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
230 MW
Researched capacity
Est. SRMC
$0.00/MWh
Key information
Capacity (AI)
230 MW

Banana Range Wind Farm website (EDF power solutions Australia) states the project will produce 230 MW; the project page also references 41 wind turbines.

AEMO status Publicly Announced
Project status Development (AI)

Banana Range Wind Farm website (EDF power solutions Australia) says construction is planned to start in 2027 and the project is still being developed; Banana Shire Council also lists the project status as Development.

Coordinates

DUID
Owner Orange Creek Energy Pty Ltd
Commissioned Dec 2026
Expected closure 2058
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Vestas
Turbine model V162-6.2
Equipment confidence low
Stats window
13 Jun 2026 18:20 → 14 Jun 2026 18:20 AEST

Dispatch & revenue

13 Jun 2026 18:20 → 14 Jun 2026 18:20 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
230 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$722.76M

Shown in table
$722.76M (2026 real AUD)

How this was derived
Calculation applied to the current 228 MW project capacity; capex_basis set to estimated.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MW derived
$3,142,435

Shown in table
$3.14M (2026 real AUD)

How this was derived
Used as the technology-default capex benchmark because no current Banana Range project-specific AUD capex disclosure was found.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX (annual)
$6.38M

Shown in table
$6.38M (2026 real AUD)

How this was derived
Calculated using the current 228 MW capacity; project-specific O&M contract prices are not disclosed.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX / MW-yr
$28,000

Shown in table
$28.0k (2026 real AUD)

How this was derived
Used as technology-default fixed O&M because no Banana Range project-specific O&M contract value was found.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

How this was derived
Used as the variable O&M assumption for a wind farm where the reference source treats O&M as fixed/LTMA-style cost.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

How this was derived
Used to set fuel cost to zero for wind generation; no fuel contract is applicable.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 04 Jun 2026

Heat rate GJ/MWh

How this was derived
Heat rate is a thermal-generation metric and is not meaningful for wind.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 04 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 04 Jun 2026

Notes
No project-specific financial close, EPC contract price, O&M contract price, turbine supply agreement, or closure/decommissioning provision was found in public sources. Capex and O&M are estimated from AEMO/Aurecon 2024 onshore-wind benchmarks scaled to 228 MW and adjusted using Aurecon's Biloela location/O&M factors. Calculation: base EPC AUD 3.170m/MW x 228 MW x 1.15 Biloela revised location factor = AUD 831.174m; land/development allowance = 2.5% of base EPC = AUD 18.069m; estimated total = AUD 849.243m. Fixed O&M calculation: AUD 28,000/MW-year x 1.26 Biloela O&M factor = AUD 35,280/MW-year; x 228 MW = AUD 8.044m/year. Variable O&M is reported as 0 only because Aurecon treats onshore-wind variable O&M as included in fixed O&M, not because no variable maintenance costs exist. Current schedule is uncertain/conflicting: the user-provided online date is 2026-12-01; Powerlink's November 2025 connection newsletter indicates connection construction from September 2026 pending approvals; the project website says construction is planned to start in 2027; Banana Shire Council still lists construction start 2024 and end 2027. No generator-specific closure date was found; wind technical/operational life is assumed at the low end of Aurecon's 30-35 year range, with economic/design life 20-25 years.

Latest AI note (4 Jun 2026)

No current FID/construction-cost disclosure for the 228 MW / 41-turbine Banana Range Wind Farm was found. The capex estimate uses AEMO/Aurecon 2024 onshore-wind benchmark EPC cost of AUD 3,170/kW applied to 228 MW, excluding land/development costs. If adding Aurecon's illustrative land and development allowance of 2.5% of CAPEX, total estimated capex would be approximately AUD 740.8 million. A historical 2019 media report cited US$240 million for an earlier 180 MW / 50-turbine approved scope; this is superseded by the current 228 MW / 41-turbine design and is not used as the main capex assumption. Current owner/developer evidence indicates EDF acquired the project from Goldwind Australia and Lacour Energy in May 2021, while the original vehicle/owner name Orange Creek Energy Pty Ltd appears in older development materials. Project website timeline indicates financial close in 2025, construction in 2026 and operation in 2027; this conflicts with the provided online date of 2026-12-01 and should be reviewed. Major end-of-life assumption: onshore wind technical life 30-35 years with life-extension assessment; GHD estimates retirement costs at AUD 152,000/MW for a representative onshore wind farm, but this is not included in capex or opex fields.