Baking Board Solar Farm (MMT)

Solar · MMT Projects T/A Renewable Projects Management · Solar PV - Fixed

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Planning record and sale listing indicate the site is DA-approved / proposed, not operational; Ray White Rural Queensland listing (2024) and Queensland planning context.

Coordinates

DUID
Owner MMT Projects T/A Renewable Projects Management
Commissioned
Expected closure
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
13 Jun 2026 15:25 → 14 Jun 2026 15:25 AEST

Dispatch & revenue

13 Jun 2026 15:25 → 14 Jun 2026 15:25 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$412.19M

Shown in table
$412.19M (2026 real AUD)

How this was derived
The capex total is not reported by MMT; it is a derived 2025 nominal estimate from AEMO/GHD benchmark values scaled and adjusted to fixed PV.

Reference
2025 Energy Technology Cost and Technical Parameter Review (low confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MW
$1,373,963

Shown in table
$1.37M (2026 real AUD)

How this was derived
GHD’s 2025 AEMO benchmark gives a 200 MWac / 240 MWdc large-scale solar project with EPC AUD 1,080/kWdc and AUD 64.742m land/development cost. This was scaled to MMT’s 300 MWac project.

Reference
2025 Energy Technology Cost and Technical Parameter Review (low confidence)
Source recorded 04 Jun 2026

Fixed OPEX (annual)
$4.32M

Shown in table
$4.32M (2026 real AUD)

How this was derived
AEMO/GHD provides a current large-scale solar O&M benchmark. It was applied to assumed 360 MWdc capacity for the 300 MWac project.

Reference
2025 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fixed OPEX / MW-yr
$14,400

Shown in table
$14.4k (2026 real AUD)

How this was derived
The source expresses O&M on a DC basis. The profile field converts it to an AC-nameplate equivalent for the 300 MW generator.

Reference
2025 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

How this was derived
No separate variable O&M is modelled; it is captured in fixed O&M.

Reference
2025 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 04 Jun 2026

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

How this was derived
The generator is listed as solar fuel type; no fuel commodity cost is applicable.

Reference
Australian NEM Generators - Baking Board Solar Farm (MMT) (medium confidence)
Source recorded 04 Jun 2026

Heat rate GJ/MWh

How this was derived
Heat rate is not meaningful for a non-combustion solar PV generator.

Reference
Australian NEM Generators - Baking Board Solar Farm (MMT) (medium confidence)
Source recorded 04 Jun 2026

Confidence: low · Status: ai estimated · Capex basis: estimated · AI checked 04 Jun 2026

Notes
Baking Board Solar Farm (MMT) is listed as a publicly announced 300 MW fixed PV project with no DUID and no commercial-use date. No project-specific capex, O&M, offtake, refurbishment or closure disclosure was located. Capex is an AI estimate: current AEMO/GHD 2025 large-scale solar benchmark was scaled to 300 MW AC / 360 MWdc, then adjusted for fixed-tilt using the older ACIL Allen/AEMO fixed-to-single-axis capex ratio of 2350/2900 applied to EPC only; land/development cost was scaled unchanged. This gives estimated EPC of about AUD 315.1m plus land/development of about AUD 97.1m, total AUD 412.2m. O&M uses the current AEMO/GHD large-scale solar benchmark of AUD 12,000/MWdc/year, equal to AUD 4.32m/year for 360 MWdc or AUD 14,400/MWac/year for the 300 MW project. Variable O&M is set to zero because the AEMO/GHD benchmark includes it in fixed O&M. Asset life uses AEMO/GHD 30-year design/operational life. Major refurbishment assumption is generic: inverter refurbishment or replacement around mid-life; no MMT-specific refurbishment or closure note found.

Sources